Fleuve Volta – Ghana

Objective: Volta River Estates has opted to convert an existing banana plantation into a real estate. They request for a topographical map with levels and contours of the land with its surroundings so as to enable an appointed planner design a masterplan for the commencement of the land development as well as carry out further [...]
Read more

Dépôt Abuja – Nigeria

Context Industrial Depot complex of Setraco Nigeria limited constructed in 2012 composed of:  Central workshop heavy construction equipment  Central workshop Trucks, overhaul and repair  Heavy Duty overhaul engines  Undercarriage, Tracks  Hydraulics  Panel beating  Vulcanising section  Light Duty, vehicles repair and overhaul.  Central stores spare parts  Fuel storage  Washing bays  Administration offices to run complex Storage of used construction equipment.  The complex is to serve all construction sites of [...]
Read more

Construction – Niolon – France

Objective: The planner has consulted Vertical precision to make a general layout of the site, a detailed as-build layout, a detailed topographical map with levels, slopes and contours including all site features. Trees, powerlines, drainage, sewerage lines to the treatment plant are to be incorporated.   Project Description: In the middle of the Côte Bleue, [...]
Read more